A house and land package is usually two contracts sold together: a contract to buy a block of land and a separate contract with a builder to build a home on it. In Queensland you normally settle the land first, then pay the builder in stages as construction progresses, often funded by a construction loan. Before signing, check the builder's QBCC licence, when the land will be titled, what the inclusions and site costs are, and have a solicitor review both contracts.

66 client reviews across Google, Bark and RateMyAgent

Updated 6 November 2026

What is a house and land package?

A house and land package pairs a specific lot with a specific home design and a quoted build price. It is marketed as one product, but legally it is normally two agreements with two different parties: the land seller (often a developer) and the builder.

Because there are two contracts, there are two sets of terms, two deposits, two timelines and two parties who can be delayed.

The land contract

This is a contract to buy the lot. It sets the price, deposit, settlement date and any conditions such as finance approval. If the lot does not yet have its own title, it is a proposed lot and the Land Sales Act 1984 applies (see below).

The building contract

This is a contract with a licensed builder to construct the home on that lot. It sets the build price, plans, specification, inclusions, payment stages and construction timeframe. The Queensland Building and Construction Commission (QBCC) says having a written, dated and signed contract in place is essential, and building contracts over $3,300 must include advice about your right to a cooling-off period.

How payments work in Queensland

In most packages you pay a deposit on the land, then settle the land in full when its title is ready. Only after the land settles does construction normally begin, and the builder is then paid in stages.

QBCC states that the maximum deposit a builder can ask for on a contract of $20,000 or more is 5% of the contract price, and that the contractor cannot claim more than 50% of the contract price, including the deposit, until at least 50% of the work on site is complete (QBCC deposits and progress payments page, last reviewed 27 June 2025). Paying more than the lawful deposit, or paying ahead of the schedule, can affect your home warranty cover.

A construction loan generally releases money in stages as each progress claim falls due, rather than all at once. Lender policies on valuations, deposits, interest during the build and timeframes differ, so speak to your lender or broker early, ideally before you sign either contract.

Client reviews

In our clients’ words

From Red Door clients buying homes and investments. These are not reviews of this guide. Read all 61 client reviews.

  • Bark

    “As first‑home buyers, we honestly had no idea where to start. We were overwhelmed, stressed, and kept missing out on properties.

    A friend recommended Red Door Property Group, and it was the best decision we made.

    From day one, they guided us through every step — explaining things clearly, answering all our questions, and making sure we understood the process. They found homes that actually suited us, not just whatever was on the market, and they handled all the negotiation with confidence and care.

    We ended up securing a home we absolutely love, and we never would have found it or felt comfortable buying it without their support. Red Door made the whole experience smooth, stress‑free, and genuinely exciting.

    We’re so grateful and would highly recommend Red Door Property Group to any first‑home buyer.Thank you Harper and James”

    Read the full review from Kelly

    KellyFirst home purchase · September 2026 · Bark

  • Google

    “If we could give Harper and James six stars, we would. They went above and beyond for two young people entering the market for the first time - everything was always communicated clearly, we felt supported throughout the entire process and they made our lives infinitely easier and less stressful. Everything was a smooth transition from looking at properties to making a choice on putting in an offer, and Harper’s insight on the market in this area was invaluable and genuinely saved us a lot of money and stress. We will be recommending Red Door Property Group to every one looking to buy a place!”

    Read the full review from Elizabeth N.

    Elizabeth N.First home purchase · About June 2026 · Google

  • Bark

    “Working with Red Door Property Group was an absolute game‑changer for us.

    As first‑time investors, we were nervous about taking the leap — but Harper and James guided us through every step with clarity, confidence, and genuine care.

    Their strategic approach helped us identify the right property, negotiate effectively, and secure a fantastic result that aligned perfectly with our long‑term goals.

    From the initial consultation to settlement, their professionalism and communication were exceptional. We felt supported, informed, and empowered throughout the entire process.

    We couldn’t be happier with our first investment purchase and highly recommend Red Door Property Group to anyone looking for expert guidance and a seamless experience.”

    Read the full review from Zac

    ZacInvestment purchase · September 2026 · Bark

Titled vs untitled land

Titled land already has its own registered title, so the land can usually settle soon after the contract and the build can start. Untitled land is a proposed lot in an estate that has not yet been registered, so settlement waits until the title is created.

Under the Land Sales Act 1984, the seller of a proposed lot must give you a disclosure statement before you sign, including the proposed plan for the lot, and must settle no later than 18 months after you enter into the contract. If the seller does not settle within 18 months, other than because of your default, you may terminate by written notice, according to the Queensland Government buying off the plan page. Registration timing affects your finance, your lease and the build start.

Stamp duty applies to the land

Transfer duty (formerly stamp duty) is charged by the Queensland Government on buying property, including vacant land, and the buyer is usually responsible for paying it, according to the Queensland Revenue Office. How duty applies to your purchase depends on how the contracts are structured and your circumstances, so ask your solicitor to confirm it.

From 1 May 2025, eligible first home buyers buying vacant land to build their first home may qualify for the first home vacant land concession. Conditions apply, including building one home and moving in within 2 years of settlement. Check the current rules on the QRO website.

Turnkey vs base inclusions and site costs

A turnkey package is usually marketed as ready to move into, with items such as flooring, window coverings, driveway, fencing and landscaping included. A base or standard package may leave some of these out, so the advertised price and the final cost of a liveable home can differ.

Site costs cover preparing the block, such as earthworks, retaining, slab requirements and service connections. They vary with soil, slope and estate rules, and often drive later variations. Ask whether site costs are fixed in the contract or provisional, and get the full inclusions list in writing.

Can you negotiate a house and land package?

Sometimes. Land prices in a new estate are often set by the developer and may have limited room to move, while builders may be more flexible on inclusions, upgrades or the timing of payments. What is possible depends on the builder, the estate and the market at the time. A clear brief and comparison across several options gives you a stronger position than negotiating on price alone.

What to check before you sign

Search the builder on the QBCC licensee register and confirm the licence is current and the class matches the work. Have a Queensland property solicitor review both contracts together, including any sunset clause, the settlement date for the land and how the building contract ends if the land does not settle. Read the inclusions list line by line, confirm whether site costs are fixed, and check the estate's design guidelines and the build timeframe.

How Red Door helps

We match house and land options to your brief, drawing on dated examples from 300+ builders and developers. Before you sign, we check the builder's QBCC licence, the land and title timing, both contracts with your solicitor, and the inclusions and site costs. On house and land, the builder or developer pays our commission, disclosed first in writing.

Any package we show is a dated example, not a current offer, and availability and pricing must be confirmed at the time.

General information

This guide is general information only, current as at 6 November 2026. It is not legal, financial, tax or credit advice. Laws and lender policies change, so seek independent advice from a Queensland property solicitor, your lender or broker, and a tax adviser before you sign anything.

Questions

Questions about how packages work

How do house and land packages work?

You usually sign two contracts: one to buy the land and one with a builder to build the home. The land settles first, often once its title is registered, and the builder is then paid in stages as construction progresses. Each contract has its own deposit, conditions and timeline, so have a solicitor review them together before you sign.

Do house and land packages cost less than other ways to buy?

Not necessarily. The total cost depends on the land price, the build price, inclusions, site costs and your duty position. A package can look lower on paper and then rise once upgrades and site variations are added. Compare the full cost of a finished, liveable home, and check what is fixed in each contract before you decide.

What are the disadvantages of house and land packages?

You wait through the build and, as an investor, earn no rent while it happens. You commit from plans rather than a finished home. The land and the build are two contracts, each with its own risks, such as build delays, site costs and variations, and a valuation at completion that may differ from the price you agreed. New supply in the same estate can also affect resale. Have a solicitor review both contracts before you sign.

How much deposit do you need for a house and land package?

There are usually two deposits. The land deposit is set by the land contract. For the build, QBCC says the maximum deposit on a contract of $20,000 or more is 5% of the contract price (page last reviewed 27 June 2025). Your lender will also have its own deposit requirements, so speak to your lender or broker.

What is the difference between titled and untitled land?

Titled land already has a registered title, so it can usually settle and be built on sooner. Untitled land is a proposed lot that has not been registered yet. Under the Land Sales Act 1984, the seller must give you a disclosure statement and settle within 18 months of the contract, or you may be able to terminate.

How does Red Door get paid on house and land?

On house and land, the builder or developer pays our commission, disclosed first in writing. We match options to your brief from dated examples across 300+ builders and developers, and check the builder licence, title timing, both contracts, inclusions and site costs.

Send us your brief

Tell us what you want to buy. Our team replies to talk it through. No obligation.

No obligation. Prefer to talk? Call 1800 843 990.

General information only, current as at 6 November 2026. It is not legal, tax, financial or lending advice. Check planning, flood and title details for any property with the council, your solicitor or conveyancer, lender and accountant before you sign. Red Door Realty QLD Pty Ltd, licence 4421322.

What happens on the call

  1. We listen to your goal.
  2. We explain how we would work for you.
  3. You decide if it is a fit.

Checked before you signNo obligation

CallSend Us Your Brief